Joint band system wall/ceiling, type WD

The MSL system WD meets DIN V 18197: 2005-10 requirements
  
The 3.0 m long element is secured in the transition area between wall and ceiling on the ascending reinforcement.

For installing joint band between upper and lower retaining longitudinal metal rods we recommend using MSL fastening hooks.

The photos show an old design in which the joint band was held by a constructional steel mat.