MSL INTERNATIONAL
Schalungssysteme Lufttechnik Produktinfos News Über uns Kontakt
Construction Joint Systems | Foundation Tube Systems | Pipe Systems | Foundation Formwork Systems
 
 

MODELS

TRAPEZOID-PROFILED

SMOOTH AND MULTIPLE
USES

SHAFT-PROFILED

SHAFT-PROFILED
REINFORCED

ONE-SIDED FOUNDATION AND ROUND CASTING TRAPEZOID-PROFILED

WALL SHUTTERING RA

SHAFT-PROFILED GIRDER CASING

SHAFT-PROFILED PERFORATED HOLE CASING

ASSEMBLY INSTRUCTIONS

TRAPEZOID-PROFILED,
TYPE FS 2001 AND FS 2001G

SHAFT-PROFILE,
TYPE FS 2001 LIGHT AND
FS 2050

INTERIOR OR EXTERIOR EDGES

 
     
   
 

Assembly instructions for type
FS 2001 light and type FS 2050

 
         
 

Download:

Brochure: Foundation formwork systems
MSL Assembly instructions
Video: Schalungssysteme im Baustelleneinsatz –
Typ FS 2001 light (only german language)
Video: Schalungssysteme im Baustelleneinsatz –
Typ FS 2050 (only german language)
 

Assembly instructions for type FS 2001 light and
type FS 2050:

Photo 6: 2 casing elements are stood up with the insides touching each other (Attention: both cross-sections are on the outside in each
case). Both lateral sections are placed overlapped by the length of the bracket.

Photo 7: The casing is laid and placed onto the side with the
hung brackets.

Photos 8, 9, 10: Both lateral sections are moved into 2 different directions until the ends are parallel. Then the brackets act like a joint.

Photo 11: The casing is standing, now finally the upper brackets are placed. They keep the lateral sections fixed at the prescribed distance.

 
         
   
 
::: HOME ::: TOP ::: LINKS ::: GENERAL TERMS & CONDITIONS ::: IMPRINT :::

MSL - your specialist for temporary shuttering, shuttering systems, shuttering technology,
foundation shuttering, construction products

Copyright © 2007 MSL GmbH - Mathieu Schalungssysteme u. Lufttechnische Komponenten GmbH