MSL INTERNATIONAL
Schalungssysteme Lufttechnik Produktinfos News Über uns Kontakt
Construction Joint Systems | Foundation Tube Systems | Pipe Systems | Foundation Formwork Systems
 
 

MODELS

TRAPEZOID-PROFILED

SMOOTH AND MULTIPLE
USES

SHAFT-PROFILED

SHAFT-PROFILED
REINFORCED

ONE-SIDED FOUNDATION AND ROUND CASTING TRAPEZOID-PROFILED

WALL SHUTTERING RA

SHAFT-PROFILED GIRDER CASING

SHAFT-PROFILED PERFORATED HOLE CASING

ASSEMBLY INSTRUCTIONS

TRAPEZOID-PROFILED,
TYPE FS 2001 AND FS 2001G

SHAFT-PROFILE,
TYPE FS 2001 LIGHT AND
FS 2050

INTERIOR OR EXTERIOR EDGES

 
     
   
 

Corrugated profile foundation lateral casing
FS-U-Form

 
         
 

Technische Daten FS-U Form:

Element length with overlapping: 0,9 m
Element length actual: 0,85 m
Element height: according to specifications
Profiling of lateral wall: 10 x 26 mm
Push-in brackets: ø 8 mm, as accessory
Recommendation for bracket distance: approx. 1 m
System components: 1 (casing)
Weight per sqm: approx. 4,5 kg
Free-standing cement height: to 0,4 m with distance brackets
Available in radius: no
Available with base plate laying: yes
Delivery time per casing: short-term
Assembly times: approx. 0,1 h/sqm
 

System descriptions FS-U-Form:

The MSL girder casing system is closed to the bottom. It consists of individual shaft-profile elements which are manufactured bent in a U-shape in lengths of approx. 90 cm. When laying, 1-2 shafts are overlapped. Angled models can be created with no problem by cutting on site. The fittings are assembled using squared timber by nailing it onto impact points. A straight foundation is achieved by nailing long pieces of squared timber at the top (Photo 2, 3, 4 and 6).
Top spacers with a support have proven to be beneficial for squared timber (Photos 5, 7, 8). In the pile foundation area (Photo 5a), the required openings of the construction steel lead-through can be created easily with a Flex. The 0.5 mm thick shaft-profiled casing elements are very dimensionally stable while the light weight remains the same.

The elements are combined with a minimal freight volume and
shipped on a palette (Photo 1). Before pouring the concrete, the casing should be filled with dirt to better absorb the pressure from the fresh concrete from outside or should be stayed with conventional supports. The elements are manufactured in width and height H1 + H2 according to your specifications.

Photos 7+8 show two-part recess frames made of shaft-profile
steel plates. The casing is bent into a U-shape at the factory and has two perforations each. On site the casing is bent and attached to the girder or strap casing (Photo 8, 8a). The system is the most affordable MSL model.

Download:

Brochure: Foundation formwork systems
System Specifications FS-U Form
Offer text
Customer inquiry
 
         
   
 
::: HOME ::: TOP ::: LINKS ::: GENERAL TERMS & CONDITIONS ::: IMPRINT :::

MSL - your specialist for temporary shuttering, shuttering systems, shuttering technology,
foundation shuttering, construction products

Copyright © 2007 MSL GmbH - Mathieu Schalungssysteme u. Lufttechnische Komponenten GmbH